Facilities
Search by Type
Map
Search Results
(5 results found)
Hours:
Status:
Open
Comments:
The Annex floor is available for rentals mid April to early September.
Description:
The floor surface is available for rent during the off-season from early May to early September. The Annex is located on the curling club side of the ...
read more about Annex Main Floor (Southampton Coliseum)
26 Albert Street South, Southampton
Hours:
Status:
Closed for the season
Comments:
Port Elgin Complex Arena will be reopening on Monday, August 19, 2024.
Description:
The Plex has 8 months of ice available for rent from mid August until the end of April. The ice surface is 195' x 85'. There are 5 dressing rooms, a ...
read more about Ice Surface
600 Tomlinson Drive, Port Elgin, N0H 2C0
Hours:
Status:
Closed for the season
Comments:
Reopening October 1, 2024.
Description:
The Southampton Coliseum has ice available 6 months of the year from October 1 until the end of March. The ice surface is 185' x 85'. There are 4 ...
read more about Ice Surface
26 Albert Street South, Southampton
Hours:
Status:
Open
Description:
A multi-use facility that includes an ice pad with spectator seating for 700, two floor surfaces (the arena and curling club), a community room ...
read more about Southampton Coliseum
26 Albert Street South, Southampton
Hours:
Status:
Open
Description:
A multi-use facility that includes an ice pad with spectator seating for 1,100, arena floor, community hall and the Town's administration offices. ...
read more about The Plex
600 Tomlinson Drive, Port Elgin, N0H 2C0